ADVANTAGES OF SKJÖLDGAS

Simple construction with HDPE lined earth basins and integrated acidification, gas storage and final clarification result in:

• low investment - and operation costs
• the payback period of the investment is only 2-4 years.
  Thereafter the plant makes cash money.

Low volume load (approx. 5 kg COD/m³ /d) and double-stage configuration with „adapted“ anaerobic sludge lead to:

• a maximum of energy production
• high process stability

Further advantages of SKJÖLDGAS are:

only approx. 25 % space demand compared to aerobic cleaning
• low maintenance costs
• equalization of the produced gas during a period of one week
• optimal use for alternative energy production


SKÖLDGAS-plant for a starch factory for approx. 40 t COD/d


 